3000 building: Difference between revisions

From Sage Creek History
Jump to navigation Jump to search
No edit summary
No edit summary
Tags: Mobile edit Mobile web edit
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:


It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]].
It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]].
This building went largely unused for the first two years ([[2013-2014]], [[2014-2015]]), until Sage Creek had a large enough population to make use of the buildings classrooms.


==Classrooms==
==Classrooms==
Line 47: Line 49:
==Events==
==Events==


The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]].
*The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]].

Latest revision as of 03:26, 19 August 2018

About

File:3000buildingfrom2000building.jpg

The 3000 building is the southmost building, nearing the border of the Staff Parking Lot.

It features mostly Languages, Social Sciences, and the Home Ec Room.

This building went largely unused for the first two years (2013-2014, 2014-2015), until Sage Creek had a large enough population to make use of the buildings classrooms.

Classrooms

Second Floor

Third Floor

Events