3000 building: Difference between revisions

no edit summary
No edit summary
Tags: Mobile edit Mobile web edit
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
==About==
==About==


[[3000buildingfrom2000building.jpg|left|thumb]]
[[File:3000buildingfrom2000building.jpg|left|thumb]]


The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]].
The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]].


It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]].
It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]].
This building went largely unused for the first two years ([[2013-2014]], [[2014-2015]]), until Sage Creek had a large enough population to make use of the buildings classrooms.


==Classrooms==
==Classrooms==
Line 44: Line 46:


*[[3307]]
*[[3307]]
==Events==
*The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]].
administrator, Bureaucrats, editors, Administrators
3,611

edits