administrator, Bureaucrats, editors, Administrators
3,611
edits
No edit summary Tags: Mobile edit Mobile web edit |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==About== | ==About== | ||
[[3000buildingfrom2000building.jpg|left|thumb]] | [[File:3000buildingfrom2000building.jpg|left|thumb]] | ||
The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]]. | The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]]. | ||
It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]]. | It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]]. | ||
This building went largely unused for the first two years ([[2013-2014]], [[2014-2015]]), until Sage Creek had a large enough population to make use of the buildings classrooms. | |||
==Classrooms== | ==Classrooms== | ||
Line 44: | Line 46: | ||
*[[3307]] | *[[3307]] | ||
==Events== | |||
*The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]]. |