3000 building: Difference between revisions

no edit summary
(Created page with "==About== The 3000 building is the southmost building, nearing the border of the Staff Parking Lot.")
 
No edit summary
Tags: Mobile edit Mobile web edit
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
==About==
==About==
[[File:3000buildingfrom2000building.jpg|left|thumb]]


The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]].
The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]].
It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]].
This building went largely unused for the first two years ([[2013-2014]], [[2014-2015]]), until Sage Creek had a large enough population to make use of the buildings classrooms.
==Classrooms==
===Second Floor===
*[[3200]]
*[[3201]]
*[[3202]]
*[[3203]] - [[Jill Roth]] - [[Spanish]] Teacher
*[[3204]]
*[[3205]]
*[[3206]]
*[[3207]] - Currently the [[Robotics]]/baking room.
===Third Floor===
*[[3300]]
*[[3301]] - [[Brian Co]] - [[Economics]] Teacher and [[CP US History]] Teacher
*[[3302]] - [[Alison Williams]] - [[AP Psychology]] Teacher and [[CP US History]] Teacher.
*[[3303]]
*[[3304]]
*[[3305]]
*[[3306]]
*[[3307]]
==Events==
*The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]].
administrator, Bureaucrats, editors, Administrators
3,611

edits