3000 building: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(→Events) Tags: Mobile edit Mobile web edit |
||
Line 47: | Line 47: | ||
==Events== | ==Events== | ||
The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]]. | *The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]]. |
Revision as of 03:25, 19 August 2018
About
The 3000 building is the southmost building, nearing the border of the Staff Parking Lot.
It features mostly Languages, Social Sciences, and the Home Ec Room.
Classrooms
Second Floor
Third Floor
- 3301 - Brian Co - Economics Teacher and CP US History Teacher
- 3302 - Alison Williams - AP Psychology Teacher and CP US History Teacher.
Events
- The 3000 building was the site of a pipe burst on March 21st, 2018.