3000 building: Difference between revisions

From Sage Creek History
Jump to navigation Jump to search
No edit summary
No edit summary
Line 44: Line 44:


*[[3307]]
*[[3307]]
==Events==
The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]].

Revision as of 19:31, 23 March 2018

About

File:3000buildingfrom2000building.jpg

The 3000 building is the southmost building, nearing the border of the Staff Parking Lot.

It features mostly Languages, Social Sciences, and the Home Ec Room.

Classrooms

Second Floor

Third Floor

Events

The 3000 building was the site of a pipe burst on March 21st, 2018.