Performing Arts Center: Difference between revisions

From Sage Creek History
Jump to navigation Jump to search
(Created page with "===Overview=== The Performing Arts Center was conceived in the Pre-Sage Creek Era and began formal construction in the 2016-2017 School year. Costing around 14 Million...")
 
No edit summary
Line 1: Line 1:
===Overview===
===Overview===
The Performing Arts Center was conceived in the [[Pre-Sage Creek Era]] and began formal construction in the [[2016-2017]] School year. Costing around 14 Million Us Dollars to construct, it has changed construction companies two times and is currently underway to be finished by the end of the [[2017-2018]] School year, later than promised.
After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million Us Dollars to construct, it has changed construction companies two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised.


The Performing Arts Center will be utilized by classes of the [[5000 Building]] and potentially by other third party users. Students have noted that this must be the case due to the relatively small size of the liberal and performing arts at [[Sage Creek High School]] and the future economic investments that are to be made concerning the use of said center.
The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. Students have noted that this must be the case due to the relatively small size of the liberal and performing arts at [[Sage Creek High School]] and the future economic investments that are to be made concerning the use of the center.

Revision as of 22:12, 12 February 2018

Overview

After survey results showed a preference for a Performing Arts Center, construction on one began in the 2015-2016 School year. Costing around 14 Million Us Dollars to construct, it has changed construction companies two times and is currently underway to be finished by the end of the 2017-2018 school year, later than promised.

The Performing Arts Center will be utilized by classes of the 5000 building and potentially by other third party users. Students have noted that this must be the case due to the relatively small size of the liberal and performing arts at Sage Creek High School and the future economic investments that are to be made concerning the use of the center.