After survey results showed a preference for a Performing Arts Center, construction on one began in the 2015-2016 School year. Costing around 14 Million U.S. Dollars to construct, it has changed contracters two times and is currently underway to be finished by the end of the 2017-2018 school year, later than promised.
The Performing Arts Center will be utilized by classes of the 5000 building and potentially by other third party users. The building was financed via the same Prop P funds made available for the building of Sage Creek High School itself[1].
The center was already being booked before even being completed due to the planned closure of the Carlsbad Community Cultural Arts Center.
Facilities
6000 building(PAC)
History
Planning
A number of project proposals appear to have been created for the PAC[2][3], but ultimately Rachlin Partners[4] design was the one chosen.
Construction
Ribbon Cutting
On June 4th, 2018, the PAC opened to the public with a ribbon cutting held at 3:00pm.