3000 building: Difference between revisions
Jump to navigation
Jump to search
No edit summary Tags: Mobile edit Mobile web edit |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==About== | ==About== | ||
[[3000buildingfrom2000building.jpg|left|thumb]] | [[File:3000buildingfrom2000building.jpg|left|thumb]] | ||
The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]]. | The [[3000 building]] is the southmost building, nearing the border of the [[Staff Parking Lot]]. | ||
It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]]. | It features mostly [[Languages]], [[Social Sciences]], and the [[Home Ec Room]]. | ||
This building went largely unused for the first two years ([[2013-2014]], [[2014-2015]]), until Sage Creek had a large enough population to make use of the buildings classrooms. | |||
==Classrooms== | ==Classrooms== | ||
Line 44: | Line 46: | ||
*[[3307]] | *[[3307]] | ||
==Events== | |||
*The [[3000 building]] was the site of a pipe burst on March 21st, [[2018]]. |
Latest revision as of 03:26, 19 August 2018
About
The 3000 building is the southmost building, nearing the border of the Staff Parking Lot.
It features mostly Languages, Social Sciences, and the Home Ec Room.
This building went largely unused for the first two years (2013-2014, 2014-2015), until Sage Creek had a large enough population to make use of the buildings classrooms.
Classrooms
Second Floor
Third Floor
- 3301 - Brian Co - Economics Teacher and CP US History Teacher
- 3302 - Alison Williams - AP Psychology Teacher and CP US History Teacher.
Events
- The 3000 building was the site of a pipe burst on March 21st, 2018.