Top Parking Lot: Difference between revisions

From Sage Creek History
Jump to navigation Jump to search
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
==About==
The top parking lot was open from [[2013]] to [[2015]] before closing for a bit for the construction of the [[Performing Arts Center]].
The top parking lot was open from [[2013]] to [[2015]] before closing for a bit for the construction of the [[Performing Arts Center]].


Line 7: Line 5:
Access to the lot was and still is free for all.  
Access to the lot was and still is free for all.  


The top lot has 128 spaces available.
The top lot has 128 spaces available.[https://www.instagram.com/p/BnDFyQYgFif/]


[[Category:Facilities]][[Category:Parking Lot]]
[[Category:Facilities]][[Category:Parking Lot]]

Latest revision as of 17:03, 15 July 2022

The top parking lot was open from 2013 to 2015 before closing for a bit for the construction of the Performing Arts Center.

It reopened officially on June 5th, 2018, after being closed for some 2 and a half school years.

Access to the lot was and still is free for all.

The top lot has 128 spaces available.[1]