Top Parking Lot: Difference between revisions

From Sage Creek History
Jump to navigation Jump to search
(Created page with "==About== The top parking lot was open from 2013 to 2015 before closing for a bit for the construction of the Performing Arts Center. It reopened officially on J...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
==About==
The top parking lot was open from [[2013]] to [[2015]] before closing for a bit for the construction of the [[Performing Arts Center]].


The top parking lot was open from [[2013]] to [[2015]] before closing for a bit for the construction of the [[Performing Arts Center]].
It reopened officially on June 5th, [[2018]], after being closed for some 2 and a half school years.
 
Access to the lot was and still is free for all.  


It reopened officially on June 5th, [[2018]].
The top lot has 128 spaces available.[https://www.instagram.com/p/BnDFyQYgFif/]


[[Category:Facilities]][[Category:Parking Lot]]
[[Category:Facilities]][[Category:Parking Lot]]

Latest revision as of 17:03, 15 July 2022

The top parking lot was open from 2013 to 2015 before closing for a bit for the construction of the Performing Arts Center.

It reopened officially on June 5th, 2018, after being closed for some 2 and a half school years.

Access to the lot was and still is free for all.

The top lot has 128 spaces available.[1]