Performing Arts Center: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 1: Line 1:
==About==
==About==


After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million Us Dollars to construct, it has changed construction companies two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised.
After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million U.S. Dollars to construct, it has changed contracters two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised.


The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. Students have noted that this must be the case due to the relatively small size of the liberal and performing arts at [[Sage Creek High School]] and the future economic investments that are to be made concerning the use of the center.
The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. Students have noted that this must be the case due to the relatively small size of the liberal and performing arts at [[Sage Creek High School]] and the future economic investments that are to be made concerning the use of the center.
administrator, Bureaucrats, editors, Administrators
3,611

edits

Navigation menu