Traffic: Difference between revisions

Jump to navigation Jump to search
674 bytes added ,  18 February 2018
no edit summary
No edit summary
No edit summary
Line 6: Line 6:


In addition, the construction of the [[Performing Arts Center]] has also caused this traffic to become much worse on the occasion that construction equipment breaks down in the middle of the lane, or requires shutting down part of the drop-off.
In addition, the construction of the [[Performing Arts Center]] has also caused this traffic to become much worse on the occasion that construction equipment breaks down in the middle of the lane, or requires shutting down part of the drop-off.
===Pre-4-Class Years===
In the years before there was a full four classes, and before construction on the [[Performing Arts Center]] had begun, traffic was much less of a problem. Since there was no student drivers during the [[2013-2014]] school year, and very few student drivers in the [[2014-2015]] and [[2015-2016]] school years, most people went to the [[Roundabout]] at the front of the school to drop off their kids.
This meant that there was no need to stop traffic and traffic moved as fast as the 20-car or so drop off area could handle. All three [[Parking Lots]] were open as well and if time was an issue, students would be dropped off in the parking lots.
administrator, Bureaucrats, editors, Administrators
3,611

edits

Navigation menu