Traffic: Difference between revisions

10 bytes added ,  26 August 2018
No edit summary
Tags: Mobile edit Mobile web edit
 
Line 7: Line 7:
In addition, the construction of the [[Performing Arts Center]] has also caused this traffic to become much worse on the occasion that construction equipment breaks down in the middle of the lane, or requires shutting down part of the drop-off.
In addition, the construction of the [[Performing Arts Center]] has also caused this traffic to become much worse on the occasion that construction equipment breaks down in the middle of the lane, or requires shutting down part of the drop-off.


===Pre-4-Class Years===
===Pre-Full Four Classes Years===


In the years before there was a full four classes, and before construction on the [[Performing Arts Center]] had begun, traffic was much less of a problem. Since there was no student drivers during the [[2013-2014]] school year, and very few student drivers in the [[2014-2015]] and [[2015-2016]] school years, most people went to the [[Roundabout]] at the front of the school to drop off their kids.
In the years before there was a full four classes, and before construction on the [[Performing Arts Center]] had begun, traffic was much less of a problem. Since there was no student drivers during the [[2013-2014]] school year, and very few student drivers in the [[2014-2015]] and [[2015-2016]] school years, most people went to the [[Roundabout]] at the front of the school to drop off their kids.
administrator, Bureaucrats, editors, Administrators
3,611

edits