Sage Creek High School: Difference between revisions

no edit summary
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 20: Line 20:


In RGB: Green: rgb(0,51,0), Gold: rgb(185,160,40), White: rgb(255,255,255), Black: rgb(0,0,0)
In RGB: Green: rgb(0,51,0), Gold: rgb(185,160,40), White: rgb(255,255,255), Black: rgb(0,0,0)
===Campus===
The campus is roughly 33 acres, has 3 academic buildings and 1 elective building as well as a [[gym facility]].
The three academic buildings are linked below:
[[1000 building]]
[[2000 building]]
[[3000 building]]
The gym facilities are in a separate building:
[[4000 building]]
The [[elective]] building has a similar numbering scheme:
[[5000 building]]
The [[Performing Arts Center]] opened in [[2018]]:
[[6000 building]]


===Classes===
===Classes===
Line 65: Line 41:
Planning began in the mid-2000s but hit roadblocks as residents protested the building despite the obvious need for a solution.  
Planning began in the mid-2000s but hit roadblocks as residents protested the building despite the obvious need for a solution.  


In the end, proposition money was granted to fund the development of a new high school.
To fund the new high school, Proposition P was passed which allocated $198 million in local funds and $35 million in state funds to total $233 million for school improvements in the city of Carlsbad[https://web.archive.org/web/20190827190333/https://www.carlsbadusd.k12.ca.us/ppoc]. part of the estimated cost of $104 million towards the construction and opening of a new high school[[https://web.archive.org/web/20190827184815/https://www.sandiegouniontribune.com/sdut-carlsbad-trustees-pick-sage-creek-as-new-high-2011mar23-story.html]].
 
In [[2007]], the Environmental Impact Review (EIR) began to evaluate the impact the construction might have on the area.
 
The EIR was certified in January of [[2010]][https://www.sandiegoreader.com/news/2013/jun/12/stringers-carlsbads-sage-creek-high-school/].
 
Construction on the school began in [[2010]], and in [[2013]] [[Carlsbad Unified School District]] took over control of the site.[https://www.sandiegoreader.com/news/2013/jun/12/stringers-carlsbads-sage-creek-high-school/]


The board of trustees was tasked with naming the new highschool, and their selection was as follows:
The board of trustees was tasked with naming the new high school, and their selection was as follows:


Calavera Canyon High School, Canyon Del Oro High School, Foothills High School, Hillside High School, Lake Calavera High School, Laguna Vista High School, Ridgeview High School, Sage Creek High School, Shadow Mountain High School, and Sunset Hill High School.
Calavera Canyon High School, Canyon Del Oro High School, Foothills High School, Hillside High School, Lake Calavera High School, Laguna Vista High School, Ridgeview High School, Sage Creek High School, Shadow Mountain High School, and Sunset Hill High School.


The trustees narrowed it to two favorites - Calavera CanyonHigh School and Sage Creek High School - before settling on the latter[https://web.archive.org/web/20190827184815/https://www.sandiegouniontribune.com/sdut-carlsbad-trustees-pick-sage-creek-as-new-high-2011mar23-story.html].
The trustees narrowed it to two favorites - Calavera CanyonHigh School and Sage Creek High School - before settling on the latter[https://web.archive.org/web/20190827184815/https://www.sandiegouniontribune.com/sdut-carlsbad-trustees-pick-sage-creek-as-new-high-2011mar23-story.html].
Sage Creek High School officially opened its doors to the [[Class of 2017]] on August 28. [[2013]].


===Years of Operation===
===Years of Operation===


{{Years}}
{{Years}}
==Campus==
The campus is roughly 33 acres, has 3 academic buildings and 1 elective building as well as a [[gym facility]] and the [[Performing Arts Center]].
The three academic buildings are linked below:
[[1000 building]]
[[2000 building]]
[[3000 building]]
The gym facilities are in a separate building:
[[4000 building]]
The [[elective]] building has a similar numbering scheme:
[[5000 building]]
The [[Performing Arts Center]] opened in [[2018]]:
[[6000 building]]


[[Category: School]]
[[Category: School]]
administrator, Bureaucrats, editors, Administrators
3,611

edits