After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million Us Dollars to construct, it has changed construction companies two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised.
After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million U.S. Dollars to construct, it has changed contracters two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised.


The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. Students have noted that this must be the case due to the relatively small size of the liberal and performing arts at [[Sage Creek High School]] and the future economic investments that are to be made concerning the use of the center.
The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. The building was financed via the same Prop P funds made available for the building of [[Sage Creek High School]] itself[https://www.carlsbadusd.k12.ca.us/pf4/cms2/view_page?d=x&group_id=1517645644742&vdid=i19a1quezz7].
 
The center was already being booked before even being completed due to the planned closure of the Carlsbad Community Cultural Arts Center.
 
==Facilities==
 
===[[6000 building]](PAC)===
 
*[[6001]]
 
*[[6002]]
 
==History==
 
===Planning===
 
A number of project proposals appear to have been created for the PAC[https://web.archive.org/web/20170420035356/http://www.sillmanwright.com/current_perfarts.html][http://www.rachlinarchitects.com/m/work/project/sage-creek-performing-arts-center], but ultimately Rachlin Partners[http://www.rachlinarchitects.com/m/work/project/sage-creek-performing-arts-center] design was the one chosen.


===Construction===
===Construction===


[[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]]
[[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]]
Demolition of the stairways began as school was getting out in the [[2015-2016]] school year[https://web.archive.org/web/20180808064848/https://twitter.com/SCBobcats/status/614583647560036352].
The demolition would later remove part of the entry staircase, the handicap ramp, the [[Grass Hill]], and the wall next to the [[5000 building]].
===Ribbon Cutting===
On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm.