Performing Arts Center: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 25: Line 25:
[[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]]
[[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]]


Demolition of the stairways began as school was getting out in the [[2015-2016]] school year[https://web.archive.org/web/20180808064848/https://twitter.com/SCBobcats/status/614583647560036352].
The demolition would later remove part of the entry staircase, the handicap ramp, the [[Grass Hill]], and the wall next to the [[5000 building]].


===Ribbon Cutting===
===Ribbon Cutting===


On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm.
On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm.
[[Category:Facilities]][[Category:6000 building]]
administrator, Bureaucrats, editors, Administrators
3,611

edits

Navigation menu