administrator, Bureaucrats, editors, Administrators
3,611
edits
No edit summary |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 25: | Line 25: | ||
[[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]] | [[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]] | ||
Demolition of the stairways began as school was getting out in the [[2015-2016]] school year[https://web.archive.org/web/20180808064848/https://twitter.com/SCBobcats/status/614583647560036352]. | |||
The demolition would later remove part of the entry staircase, the handicap ramp, the [[Grass Hill]], and the wall next to the [[5000 building]]. | |||
===Ribbon Cutting=== | ===Ribbon Cutting=== | ||
On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm. | On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm. | ||
[[Category:Facilities]][[Category:6000 building]] |