After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million U.S. Dollars to construct, it has changed contracters two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised. | After survey results showed a preference for a [[Performing Arts Center]], construction on one began in the [[2015-2016]] School year. Costing around 14 Million U.S. Dollars to construct, it has changed contracters two times and is currently underway to be finished by the end of the [[2017-2018]] school year, later than promised. | ||
The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. | The Performing Arts Center will be utilized by classes of the [[5000 building]] and potentially by other third party users. The building was financed via the same Prop P funds made available for the building of [[Sage Creek High School]] itself[https://www.carlsbadusd.k12.ca.us/pf4/cms2/view_page?d=x&group_id=1517645644742&vdid=i19a1quezz7]. | ||
The center was already being booked before even being completed due to the planned closure of the Carlsbad Community Cultural Arts Center. | The center was already being booked before even being completed due to the planned closure of the Carlsbad Community Cultural Arts Center. | ||
Line 9: | Line 9: | ||
==Facilities== | ==Facilities== | ||
===[[6000 building]]=== | ===[[6000 building]](PAC)=== | ||
*[[6001]] | *[[6001]] | ||
Line 19: | Line 19: | ||
===Planning=== | ===Planning=== | ||
A number of project proposals appear to have been created for the PAC[https://web.archive.org/web/20170420035356/http://www.sillmanwright.com/current_perfarts.html], but ultimately | A number of project proposals appear to have been created for the PAC[https://web.archive.org/web/20170420035356/http://www.sillmanwright.com/current_perfarts.html][http://www.rachlinarchitects.com/m/work/project/sage-creek-performing-arts-center], but ultimately Rachlin Partners[http://www.rachlinarchitects.com/m/work/project/sage-creek-performing-arts-center] design was the one chosen. | ||
===Construction=== | ===Construction=== | ||
Line 25: | Line 25: | ||
[[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]] | [[File:PACConstructionViaDrone2017december.jpg|thumb|left|The [[Performing Arts Center]] view from a drone in December 2017.]] | ||
Demolition of the stairways began as school was getting out in the [[2015-2016]] school year[https://web.archive.org/web/20180808064848/https://twitter.com/SCBobcats/status/614583647560036352]. | |||
The demolition would later remove part of the entry staircase, the handicap ramp, the [[Grass Hill]], and the wall next to the [[5000 building]]. | |||
===Ribbon Cutting=== | ===Ribbon Cutting=== | ||
On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm. | On June 4th, [[2018]], the PAC opened to the public with a ribbon cutting held at 3:00pm. | ||